Water treatment/Municipal water industry

Yellow River diversion project

The Yellow River Diversion Project (World Project) draws water from the intake port of Wanjiazhai Water Conservancy Project, with a designed annual water diversion capacity of 1.2 billion square meters. The project consists of the main trunk line, the South trunk line, the connecting section and the North trunk line, and the total length of the diversion line is 452.4Km. The project is implemented in two phases: the first phase of the project through the main trunk line, the south trunk line and the connecting section to achieve 320 million square meters of water to Taiyuan. Sewage treatment, water purification engineering, urban and rural water treatment and other water treatment industries have reached a long-term cooperative relationship with our company in the procurement projects of flow meters, water quality analysis meters, pressure and temperature instruments, including but not limited to:

  • Fujian Xiamen Haicang sewage treatment plant sewage treatment control system, instrument

  • Fujian Quanzhou Baozhou sewage treatment plant sewage control system, instrument

  • Hunan Shaoyang sewage treatment plant sewage control system instrument.

  • Hunan Xiangxi autonomous prefecture Yongshun sewage treatment plant sewage control system instrument

  • Hunan Chenzhou Jiahe county sewage treatment plant sewage control system instrument